Transforming Spring Brook Park and Memorial Pond

Visionary Designs Unveiled

The Town of Walpole has taken a major step toward enhancing Spring Brook Park and Memorial Pond – a vital 35-acre natural area near Town Hall and downtown. Spring Brook Park is located at 938 East Street (Route 27) diagonally across from Farmer in the Dell, and accessible from Stone Street directly across Memorial Pond. The park hosts the Walpole Farmers Market each summer. In partnership with The Conway School of Landscape Design, conceptual plans have been released to transform these interconnected spaces into a safer, more vibrant, and ecologically resilient community asset.

Addressing Key Goals:

The student-led design project focuses on three core objectives:

  1. Activate & Beautify: Turn underused areas into dynamic community destinations.

  2. Create Unity: Overcome the physical division caused by School Street to foster a cohesive "one-park" experience.

  3. Protect Water Quality: Reduce stormwater debris entering Memorial Pond.

The conceptual design plan offers numerous suggestions for improvement.
(Click image to enlarge map)

Tackling Critical Challenges:

The plan offers integrated solutions for the area's most pressing issues:

  • Safety First: School Street, a high-traffic corridor with documented crash clusters, dangerously divides the park. The design proposes traffic-calming measures (like infiltration bump-outs and enhanced crosswalks) and explores road reconfigurations to prioritize pedestrian and cyclist safety, physically and visually linking the park's segments.

  • Ecological Restoration: Invasive species, polluted stormwater runoff, and habitat loss threaten the area. The solution? Aggressive native plant restoration, targeted invasive species management, and green infrastructure to improve water quality in Memorial Pond and boost biodiversity.

  • Activating Community Spaces: Underutilized areas can be transformed with shaded gathering spots, natural play features (think log mazes and stone scrambles), looping trails with boardwalks, and observation decks – creating inviting places for recreation and relaxation.

  • Community-Driven Design: Resident feedback directly shaped the plan. Strong demand for water access, pollinator gardens, better signage, and event spaces led to features like the proposed Town Hall pollinator garden and a redesigned Farmers Market area.

  • Sustainable & Cost-Effective Maintenance: The design reduces long-term upkeep by replacing high-maintenance turf with native meadows, leveraging volunteer programs, and creatively repurposing dredged sediment – aligning with Walpole’s climate goals.

Phased Implementation & Next Steps:

Acknowledging budget realities, the plan emphasizes feasibility through a phased, community-driven approach, with an estimated total project cost of $1.5–2 million.

Key town personnel – Patrick Deschenes (Economic Development), Landis Hershey (Conservation), and Jim Thomas (Parks Director) – will now explore the design vision for reclaiming the parks through a phased approach. Utilizing the report as a guide, they will prioritize urgent initial actions such as:

  1. Reducing stormwater pollution entering Memorial Pond.

  2. Improving trail networks.

  3. Clearing brush along Spring Brook for better access and views.

An initial $50,000 capital budget request will kickstart these priority efforts.

Get Involved & Stay Updated:

Follow Destination Downtown Walpole for ongoing project updates and community engagement opportunities.





Next
Next

Exploring the 10 iconic Walpole features of the Main Street Mural